Concrete mixers are widely used in small and medium-sized projects such as foundations, grouting piles, floors, pavements, yards, revetments, ditches, rivers, bridges, culverts, tunnels, small and medium-sized reservoirs, etc. In order to better use the equipment, users must have an in-depth understanding of the product performance, quality and service of the enterprise when purchasing the equipment, so as to avoid worries at home. Then users must have the following conditions when accepting concrete mixing, and the equipment commissioning:
1、需調(diào)試設(shè)備各部件、附件及隨機東西應(yīng)按標準裝備齊全。
1. All parts, accessories and accompanying items of the equipment to be commissioned shall be fully equipped according to the standard.
2、備好液壓油和潤滑油脂,液壓油的油質(zhì)應(yīng)符合要求。
2. Prepare hydraulic oil and lubricating grease, and the oil quality of hydraulic oil should meet the requirements.
3、按規(guī)定加注液壓油、燃油、潤滑油和冷卻水,且液壓油加規(guī)定油面。
3. Fill hydraulic oil, fuel oil, lubricating oil and cooling water as required, and add hydraulic oil to the specified oil level.
4、應(yīng)對混凝土泵進行檢查、調(diào)試和試運轉(zhuǎn),使之進入正常作業(yè)狀況,液壓體系調(diào)試后應(yīng)符合標準。
4. The concrete pump shall be inspected, debugged and test run to make it enter the normal operation condition. The hydraulic system shall meet the standard after debugging.
5、調(diào)試用混凝土攪拌車管管路管徑為125。
5. The pipe diameter of concrete mixer truck for commissioning is 125.
6、實驗混凝土應(yīng)符合標準。
6. The experimental concrete shall meet the standard.
7、設(shè)備應(yīng)安放在平整堅實的地面上。用戶們除了對在購買產(chǎn)品時需嚴格檢驗以外,其實在日常保養(yǎng)問題上也是不可缺少的必要工作,這樣才能達到在操作過程中使用輕松且使用壽命更長的理想效果。
7. The equipment shall be placed on a flat and solid ground. In addition to strict inspection when purchasing products, users are also indispensable and necessary work in daily maintenance, so as to achieve the ideal effect of easy use and longer service life in the process of operation.
此外平常的維護保養(yǎng)工作也要做好,比如:
In addition, routine maintenance work should also be done well, such as:
1.攪拌車發(fā)動機使用方法,電壓多少,頻率多少,才可以啟動電機。啟動電源,然后發(fā)動柴油機,怠速運轉(zhuǎn)夏天5分鐘。冬天15分鐘后,升速電壓400V,頻率50Hz。合上發(fā)電機空開
1. The motor can be started only after the use method, voltage and frequency of the mixer engine. Start the power supply, then start the diesel engine and idle for 5 minutes in summer. After 15 minutes in winter, speed up to 400V and 50Hz. Close the generator air switch
2.攪拌車調(diào)整切割環(huán)間隙,切割環(huán)間隙過大會導(dǎo)致堵S管和錐管。在料斗后方,有一個固定搖臂的大螺母,松開螺母鎖片,用扳手擰死,然后再退回四分之一圈。裝好鎖片即可。
2. The mixer adjusts the clearance of the cutting ring, and the excessive clearance of the cutting ring will lead to the blockage of S pipe and cone pipe. At the back of the hopper, there is a big nut to fix the rocker arm. Loosen the nut lock, screw it with a wrench, and then return it for a quarter of a turn. Install the locking plate.
3.攪拌車潤滑系統(tǒng)故障判斷,潤滑系統(tǒng)堵死,會導(dǎo)致分配器閥芯不動作,共有8個潤滑點,如果分配器不動作,先檢查主進油銅管是否暢通,不暢通則是潤滑泵堵死。暢通則將8跟銅管依次拆掉,沒拆一根泵送7,8次,看分配器閥芯是否動作。來判斷是哪一個潤滑點堵死。
3. Judging the failure of the lubrication system of the mixer truck, if the lubrication system is blocked, the distributor valve core will not act. There are 8 lubrication points in total. If the distributor does not act, first check whether the main oil inlet copper pipe is unblocked. If it is not unblocked, the lubrication pump is blocked. If it is unblocked, remove 8 copper pipes in turn, and pump 7 or 8 times without removing one to see whether the valve core of the distributor acts. To determine which lubrication point is blocked.